欢迎访问第一题库!

There is nothing in this world constant but inconstancy.-SWIFTProject after project designs a set of

第一题库 分享 时间: 加入收藏

考试:中级软件水平考试

科目:(中级) 软件评测师(在线考试)

问题:

There is nothing in this world constant but inconstancy.-SWIFTProject after project designs a set of algorithms and then plunges into construction of customer-deliverable software on a schedule that demands delivery of the first thing built.In most projects,the first system built is( )usable.It may be too slow,too big,awkward to use,or all three.There is no( )but to start again,smarting but smarter,and build a redesigned version in which these problems are solved.The discard and( )may be done in one lump,or it may be done piece-by-piece.But all large-system experience shows that it will be done.Where a new system concept or new technology is used,one has to build a system to throw away,for even the best planning is not so omniscient(全知的)as to get it right the first time.The management question,therefore,is not whether to build a pilot system and throw it away.You will do that.The only question is whether to plan in advance to build a( ),or to promise to deliver the throwaway to customers.Seen this way,the answer is much clearer.Delivering that throwaway to customers buys time,but it does SO only at the(请作答此空)of agony(极大痛苦)for the user,distraction for the builders while they do the redesign,and a bad reputation for the product that the best redesign will find hard to live down.Hence plan to throw one away;you will,anyhow.
A:worth
B:value
C:cost
D:invaluable

答案:


相关标签:

(中级)软件评测师     软件评测     SWIFTProject     inconstancy     中级     constant    

热门排序

推荐文章

阅读下列说明,回答问题1至问题3,将解答填入答题纸的对应栏内。【说明】某项目由A、B、C、D、E、F、G、H、I、J共10个工作包组成,项目计划执行时间为5个月。在项目执行到第3个月末的时候,公司对项 下面是公共营养师采用对某机关食堂2007年11月15日一天的情况进行的膳食调查后填写的食物量登记表。计算11月15日就餐人日数。 阅读以下说明,回答问题1至问题4,将解答填入答题纸的对应栏内。【说明】某IT部门的小张在撰写本企业的信息化管理报告时,提到企业信息安全的管理所存在的问题时有如下表述(下面方框内)。请分析小张提出的企业 题目请看图片 设有关系模式R(A1,A2,A3,A4,A5,A6),其中:函数依赖集F={A1→A2,A1A3→A4,A5A6→A1,A2A5→A6,A3A5→A6},则( )是关系模式R的一个主键 阅读以下说明,回答问题1至问题4,将解答填入答题纸对应的解答栏内。【说明】某公司上网用户较少(约50台上网机器),因此公司网管申请了公网IP地址(117.112.2.101/30),拟通过NAT方式结 CIDR技术解决了路由缩放问题,例如2048个C类网络组成一个地址块,网络号从192.24.0.0~192.31.255.0这样的超网号应为( )。 项目经理在项目管理时使用了下图,该图是( )。 围绕创建工作分解结构,关于下表的判断正确的是 ( ) 。 使用CIDR技术把4个C类网络220.117.12.0/24、220.117.13.0/24、220.117.14.0/24和220.17.15.0/24汇聚成一个超网,得到的地址是( )。
221381
领取福利

微信扫码领取福利

微信扫码分享